Deck Footings – on a disturbed soil hillside
Metchosin house backing on to a ravine deck footings needed to be installed in disturbed soil next to the hillside. Very loose, damp soil and clay mix would have been almost impossible to concrete, but not a problem for a 7 ft screw pile. Adjustable fittings allowed for saddle height adjustments for leveling posts and beam.